C4ISR Test & Evaluation Support Services

C4ISR TEST & EVALUATION SUPPORT SERVICES

Joint Warfighter Support for EUCOM & CENTCOM

The Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) Test & Evaluation Communications Network Department, Code 50C, of the Space and Naval Warfare Systems Center Atlantic (SSC LANT), in response to Department of Defense (DoD) and other Government agency tasking, requires continued world-wide C4ISR support. SSC LANT must be able to respond quickly and effectively in order to meet the needs of the rapidly expanding world-wide DoD client networks.

Contract # N6523613D4147

Under this contract DRS Technologies provides effective and innovative solutions that are immediately available to support the joint warfighter worldwide. This contract is primarily executed with Germany-based contract personnel located near the SSC LANT Stuttgart office with approved host nation Technical Expert Status Accreditation (TESA) personnel for extended assignment.

SSC LANT provides systems engineering, analysis, design, development, acquisition, integration, installation, testing, maintenance, and integrated logistic support for various communication networks/systems. These systems support the operational requirements of the DoD and other U.S. government sponsors worldwide for continued C4ISR Test & Evaluation support.

This contract provides C4ISR Joint Warfighter Support for the U.S. European Command and U.S. Central Command with:

  • Program Management: Program Support; Program Support Documentation
  • Systems Engineering: Research and Development; Modeling and Simulation; System Design and Documentation; Configuration Management; Security Systems; Knowledge Management; Network Management; Information Assurance
  • Technical Support: Analysis and Technology Investigations; Equipment/Material Procurement; Help Desk and Maintenance Support; Maintenance; Pre-construction/Construction Management
  • System Implementation: Engineering/Technical Plans, Manuals, and Report Development; Equipment/Systems Installation, Integration, Testing, and Verification; Equipment/Systems Fabrication, Assembly and/or Verification; Equipment/Material Rental
  • Testing and Evaluation: Test plans and procedures; Testing; Testing Documentation
  • Life-Cycle Logistics Support: Develop and Prepare Integrated Logistics Support Plans; Training; Technical Manuals